“I'm investing crores and relying on the contractor's own reports.”

Your own team on the project: progress verified, bills checked, quality inspected. Independent of the contractor, by contract.

The response

What RRC puts in place

  1. 01

    Your own programme team on the project. We work for you, not the contractor, and by contract we take no share in the construction we check.

  2. 02

    A real schedule: baseline, critical path, and a rolling look-ahead, so you know the actual completion date rather than the promised one.

  3. 03

    Bill verification. Every contractor bill is checked against measured work before you pay, with cost-to-complete and final-cost forecasts kept current.

  4. 04

    Quality inspected before it disappears into concrete: test plans, material checks, hold points, and defects tracked to closure.

  5. 05

    RRC COMMAND dashboards, with every number traceable to a geo-tagged site record.

Engines involved

What powers it

Visible control

What you see in 30 / 90 days

First 30 days

  • Governance running: who decides what, when, against which gates.
  • The honest baseline. Schedule, cost, and risk established from site records, not from the contractor's last report.

By day 90

  • A steady control cycle: measured progress, verified bills, inspected quality, tracked safety.
  • One version of the programme. The client sees what the programme sees.

Mandate & commercial model

Typical scope

To be added: Typical mandate scope and commercial model note (fee structures, engagement terms) — pending commercial inputs from RRC.

Reference

On record

Energy & Industrial

NTPC NSTPP Stage-II, Nabinagar

Civil works within the 3 × 800 MW programme, including coal-handling and water infrastructure

Executing entity:
Delivery Alliance participating organisation
RRC relationship:
Delivery Alliance experience

Client questions

Asked before appointment

We already have a contractor. Why do we need a PMU?

Because right now your contractor reports on itself. An Owner's PMU is your own team on the project: we verify progress, certify bills against measured work, and inspect quality before it gets covered up. The contractor builds; we make sure you know the truth.

How is the PMU's independence protected?

By contract. When RRC is appointed as an independent PMU, the assurance role is contractually separated from any construction role. We cannot mark our own homework, and neither can anyone else on your programme.

What information will we actually see?

Dashboards and reports you can act on: progress, cost, risk, quality, and safety, each traceable to geo-tagged site records. The client sees what the programme sees.

Next step

Sound like your situation? Talk to the team about Owner's PMU.